Pay app claims checked against field reports
Upload this month's pay application and the superintendent's field notes. You get an exceptions report ranked by dollar exposure, before you sign.
- 25 credits a pay app, no subscription
- A second AI model reviews every result
- Nothing to install or connect
You upload
- SubA_PayApp_G702_G703.pdf2 lines, stored materials
- Super_weekly_field_report.txtLast week of the period
You get back
| Line | Claimed | Supported by | Status |
|---|---|---|---|
| 7 Rooftop HVAC units | 92% | 78% to 82% | |
| Units 1 to 7 are done; 8 to 10 still wait on hookups and startup. Claimed $285,200; the gap is $31,000 to $43,400. | |||
| 9 Mechanical piping | 55% | No number | |
| The note says only 'good progress'. No percent is supported, and nothing is guessed: ask for specifics or check on site before you decide. | |||
| Stored materials | $48,000 | Kept apart | |
| Fittings stored on site are not installed work. They are kept apart from installed progress and not compared with the notes. | |||
2 of 3 items to check25 credits
You upload
- GC_B_PayApp_G702_G703.pdf3 schedule lines
- Field_notes_month.txtWeekly site reports
- Change_order_log.csv4 entries, 1 pending
You get back
| Line | Claimed | Supported by | Status |
|---|---|---|---|
| 6 Fire sprinkler piping | 80% | 60% to 70% | |
| Mains and branches are done on floors 1 to 3 of 5; floors 4 and 5 are under way. Claimed $120,000 of $150,000; the gap is $15,000 to $30,000. | |||
| 3 Sitework and earthwork | 105% | Max 100% | |
| Previous plus this period comes to $210,000 on a $200,000 line. No line can be billed past its scheduled value. | |||
| 11 Plumbing rough-in | 72% | 65% by dollars | |
| Dollar entries of $117,000 on $180,000 are 65%, not the 72% claimed. | |||
| Change-order log | CO 3 pending | Not counted | |
| CO 3 is still pending in the log, so it is not counted toward the contract sum. | |||
3 of 4 items to check25 credits
You upload
- ElecC_PayApp_G702_G703.jpgPhoto: G702 and 3 lines
- Field_notes_month.txtWeekly site reports
You get back
| Line | Claimed | Supported by | Status |
|---|---|---|---|
| 10 Low-voltage, fire alarm | 50% | 20% to 30% | |
| Rough-in is done on 3 of 10 zones and none are trimmed. Claimed $75,000 of $150,000; the gap is $30,000 to $45,000. | |||
| Retainage (G702 line 5) | $9,000 | $18,000 at 10% | |
| The application states a 10% rate on $180,000 completed and stored, which is $18,000. The retainage shown is $9,000. | |||
| 12 Grounding and bonding | 60% | Not read | |
| The scheduled value read from the photo was not in the row it quoted, so it was left out and the line was not checked. Check the original. | |||
3 of 3 rows to check25 credits
Invented sample data. No real project, company or person. Select a status to see why.
How it works
-
Upload two things
The pay application (spreadsheet, Word, PDF or a scan) and the field notes for the same period.
-
Code checks, you decide
Code runs the checks and the arithmetic. A second model reviews the result and lists what is left for you.
-
Download the memo
An exceptions memo and a line-by-line reconciliation, ready before you sign.
What you can put in the job notes
Optional. This service reads only the instructions below, one per line as Label: value. Any other line is not used, and the result lists it as a problem.
- Threshold How many percentage points a claim may sit above the field-supported range before the line is flagged. From 0.5 to 50. The default is 5.
Threshold: 7 points
At most 4,000 characters.
What you download
Exceptions memo
Ranked by dollar exposure: claimed percent against the range the field supports.
Reconciliation spreadsheet
Every line shown, clean ones too, so you see the whole pay app was checked.
One-line recommendation
A suggestion for each pay application, never an automatic action.
How it compares
| By hand | GroundClaim | Billing software | |
|---|---|---|---|
| What gets checked | Every line, against field notes | Every line, against field notes | Contract and schedule of values |
| Reads your field reports | If someone has time | Yes, with the excerpt | Not stated |
| Who checks the result | You, by hand | A second AI model, problems listed | Not stated |
| Price | Your own hours | 25 credits a pay app | Often quote only |
Pay per job, no subscription
Pay application reconciliation costs 25 credits. Credits never expire.
- 25 credits $25 $1.00 a credit Buy 25 credits
- 100 credits $90 $0.90 a credit Buy 100 credits
- 500 credits $400 $0.80 a credit Buy 500 credits
- 2,000 credits $1,400 $0.70 a credit Buy 2,000 credits
Haven't bought credits yet? 3 to 6 days after you sign up, we add 5 credits toward your first job, once.
Credits are shared across every ClerkRow tool: buy them on any of our sites and spend them on any other. See every tool at ClerkRow. Welcome credits are given once per person, not once per site.
What a credit and a unit mean
A credit is the prepaid unit you spend on jobs: each kind of job costs a fixed number of credits, and a credit costs between $1.00 (25-credit pack) and $0.70 (2,000-credit pack).
- Pay application reconciliation: 25 credits
- One job's monthly pay application (G702/G703 as a spreadsheet, a Word or PDF table, or a scan or photo; up to 400 lines) reconciled against the field notes uploaded with it.
What a job costs
- 1 pay app (25 credits)
- $25Buys 1 × 25
- 5 pay apps (125 credits)
- $115Buys 1 × 100 + 1 × 25
- 20 pay apps (500 credits)
- $400Buys 1 × 500
Your files, handled carefully
Hosted on AWS
The service and its storage run on AWS. The AI is Claude on Amazon Bedrock.
Deleted on a schedule
Paid work is kept 365 days, then removed. Unused uploads go after 72 hours.
Not used for training
The Bedrock calls are not used to train any model, and your files are never sold.
Encrypted
Files are encrypted in transit and at rest, and access is limited to what the service needs.
Questions
Who checks the result?
A second, stronger AI model reviews every result and lists what is left for you to decide; the drafting model corrects the serious problems the review finds, and code checks every correction. Results are not verified by a person.
Does GroundClaim accept or reject a pay app?
Never. It flags lines and suggests; you decide what to do with each one. A flag is a reason to look, not grounds to withhold payment.
What if the field notes are vague?
The line is marked as insufficient evidence. No percentage is invented. You get a prompt to ask for specifics or check on site.
Will it handle our schedule of values format?
It reads AIA G702/G703 schedules of values and custom ones, as spreadsheets, Word or PDF tables, or scans and photos. Try one closed-out project first, where you already know the answer. The worst case is 25 credits.
Do I need to change my billing system?
No. You upload the documents and download a report. There is no integration with Sage, Procore or GCPay today.
How do credits work?
Packs are 25 credits for $25, 100 for $90, 500 for $400 and 2,000 for $1,400. A pay app is 25 credits. Credits never expire and there is no subscription.
Who is behind GroundClaim?
NETBEARS TEAM SRL, a small software company with a new product, not yet proven on a real job. We have no customers to quote and no SOC 2 report, so the samples here use invented data.
Something else? Contact us.
Check this month's pay app before you sign.
Create an account, upload the pay app and field notes, download the exceptions memo.